FAQFAQ   SearchSearch   MemberlistMemberlist  Chat Chat  UsergroupsUsergroups  CalendarCalendar RegisterRegister   ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Iraqi Dam Seen In Danger of Deadly Collapse

 
Post new topic   Reply to topic    9/11, 7/7, Covid-1984 & the War on Freedom Forum Index -> Stratehy Of Tension, Fake Terror, 9/11 & 7/7 Truth News
View previous topic :: View next topic  
Author Message
karlos
Validated Poster
Validated Poster


Joined: 26 Feb 2007
Posts: 2516
Location: london

PostPosted: Wed Oct 31, 2007 3:23 am    Post subject: Iraqi Dam Seen In Danger of Deadly Collapse Reply with quote

Iraqi Dam Seen In Danger of Deadly Collapse

By Amit R. Paley
Washington Post
Tuesday, October 30, 2007

The largest dam in Iraq is in serious danger of an imminent collapse that could unleash a trillion-gallon wave of water, possibly killing thousands of people and flooding two of the largest cities in the country, according to new assessments by the U.S. Army Corps of Engineers and other U.S. officials.

Even in a country gripped by daily bloodshed, the possibility of a catastrophic failure of the Mosul Dam has alarmed American officials, who have concluded that it could lead to as many as 500,000 civilian deaths by drowning Mosul under 65 feet of water and parts of Baghdad under 15 feet, said Abdulkhalik Thanoon Ayoub, the dam manager. "The Mosul dam is judged to have an unacceptable annual failure probability," in the dry wording of an Army Corps of Engineers draft report.


At the same time, a U.S. reconstruction project to help shore up the dam in northern Iraq has been marred by incompetence and mismanagement, according to Iraqi officials and a report by a U.S. oversight agency to be released Tuesday. The reconstruction project, worth at least $27 million, was not intended to be a permanent solution to the dam's deficiencies.

"In terms of internal erosion potential of the foundation, Mosul Dam is the most dangerous dam in the world," the Army Corps concluded in September 2006, according to the report to be released Tuesday. "If a small problem at Mosul Dam occurs, failure is likely."

The effort to prevent a failure of the dam has been complicated by behind-the-scenes wrangling between Iraqi and U.S. officials over the severity of the problem and how much money should be allocated to fix it. The Army Corps has recommended building a second dam downstream as a fail-safe measure, but Iraqi officials have rejected the proposal, arguing that it is unnecessary and too expensive.

The debate has taken place largely out of public view because both Iraqi and U.S. Embassy officials have refused to discuss the details of safety studies -- commissioned by the U.S. government for at least $6 million -- so as not to frighten Iraqi citizens. Portions of the draft report were read to The Washington Post by an Army Corps official who spoke on condition of anonymity because of the sensitivity of the matter. The Post also reviewed an Army Corps PowerPoint presentation on the dam.

"The Army Corps of Engineers determined that the dam presented unacceptable risks," U.S. Ambassador Ryan C. Crocker and Gen. David H. Petraeus, the U.S. commander in Iraq, wrote in a May 3 letter to Prime Minister Nouri al-Maliki. "Assuming a worst-case scenario, an instantaneous failure of Mosul Dam filled to its maximum operating level could result in a flood wave 20 meters deep at the City of Mosul, which would result in a significant loss of life and property."

Sitting in a picturesque valley 45 miles along the Tigris River north of Mosul, the earthen dam has one fundamental problem: It was built on top of gypsum, which dissolves when it comes into contact with water.

Almost immediately after the dam was completed in the early 1980s, engineers began injecting the dam with grout, a liquefied mixture of cement and other additives. More than 50,000 tons of material have been pumped into the dam since then in a continual effort to prevent the structure, which can hold up to 3 trillion gallons of water, from collapsing.

After the U.S.-led invasion of Iraq in 2003, American officials began to study risks posed by the dam, which they said were underestimated by Iraqis.

"Iraqi government believes dam is safe," concluded a 32-page PowerPoint presentation prepared by the Army Corps and dated December 2006.

On a tour of the dam on a recent blistering afternoon, Ayoub, the manager, contended that the dam was safe but acknowledged the unusual problems with it.

Iraq's largest dam is in danger of imminent collapse, which could kill hundreds of thousands of people, U.S. officials say. But the officials and their Iraqi counterparts cannot agree on a solution.
Seepage from the dam funnels into a gushing stream of water that engineers monitor to determine the severity of the leakage. Twenty-four clanging machines churn 24 hours a day to pump grout deep into the dam's base. And sinkholes form periodically as the gypsum dissolves beneath the structure.

"You cannot find any other dam in the world like this," said Ayoub, a mustachioed man in a dark business suit who has worked at the dam since 1983 and has managed it since 1989. Water rushes down a spillway at Mosul Dam. As engineers monitor the structure to determine leakage, machines constantly pump grout deep into its base. (U.s. Army Corps Of Engineers) About two years ago, Ayoub became concerned that the pressure of the water was putting the dam at risk of failure. So he ordered that the dam's water level, which can reach 330 meters above sea level, not exceed 319 meters.

But reports prepared by the Army Corps of Engineers began to raise new alarms. "Mosul Dam is 'unsafe' in any definition," the PowerPoint presentation said. It added: "Condition continually degrading" and "Failure mode is credible." Under a section labeled "Consequences of Failure," it says: "Mass civilian fatalities."

Ayoub said U.S. officials spoke in person about the dam in even more apocalyptic terms. "They went to the Ministry of Water Resources and told them that the dam could collapse any day," he said.

The report so alarmed the governor of Nineveh province, where the dam is located, that he asked that it be drained of all water immediately, Ayoub said.

Ayoub said he agrees that the most catastrophic collapse of the dam could kill 500,000 people, but he said U.S. officials have not convinced him that the structure is at high risk of collapse. "The Americans may very well be right about the danger," Ayoub said. "I think it is safe enough that my office is in the flood plain."

In an interview Monday night, Abdul Latif Rashid, Iraq's minister of water resources, said that he believed the safety situation was not critical and that he was more inclined to trust his engineers than American reports.

"Is the dam going to collapse tomorrow?" Rashid said. "I can't tell you that. Let us hope that we avoid a disaster and focus now on a solution."

The Army Corps has recommended that a partially constructed dam at Badush, which lies between Mosul Dam and the city, be finished as a stopgap measure in case Mosul Dam collapses.

But Salar Bakir Sami, director general of planning and development at the Water Resources Ministry, said Iraqi government officials do not think it is necessary to spend the estimated $10 billion for such a project. Instead, he said, the ministry planned to spend $300 million to construct a smaller version of the Badush dam that would generate electricity and provide irrigation, but not serve as a safety valve in case Mosul Dam breaks.

Rashid said his top priority is to fix Mosul Dam by building a concrete wall at its foundation that should shore up the design and provide "a permanent solution." He said experts have just discovered cutting-edge technology that would allow such a wall to be built, perhaps with construction starting by next year at a cost of less than $1 billion.

In the report to be released Tuesday, the Office of the Special Inspector General for Iraq Reconstruction, a federal oversight agency, found that little of the reconstruction effort led by the U.S. Embassy has succeeded in improving the dam. The office reviewed contracts worth $27 million, but an embassy official said the total cost of the project was $34 million.

The review found that a Turkish company, which was paid $635,000 for a contract awarded 19 months ago to build storage silos for cement, had done so little and such poor-quality work that its project may have to be restarted. One company contracted to design grout-mixing plants instead submitted plans for unusable concrete-mixing plants. High-tech equipment meant to help grouting is gathering dust because it won't work, according to investigators.

Embassy and Army Corps officials noted that it has been difficult to conduct oversight of the project because it is in a dangerous area. They said that contracts with the worst businesses have been terminated and that steps have been taken to ensure better management of the project in the future.

"Our focus is on whether the project that the Corps undertook got carried out and the answer to that question is no," said Stuart W. Bowen Jr., the special inspector general. "The expenditures of the money have yielded no benefit yet."

_________________
Back to top
View user's profile Send private message Send e-mail Visit poster's website
conspiracy analyst
Trustworthy Freedom Fighter
Trustworthy Freedom Fighter


Joined: 27 Sep 2005
Posts: 2279

PostPosted: Wed Oct 31, 2007 11:34 am    Post subject: Re: Iraqi Dam Seen In Danger of Deadly Collapse Reply with quote

stelios wrote:
Iraqi Dam Seen In Danger of Deadly Collapse

By Amit R. Paley
Washington Post
Tuesday, October 30, 2007

The largest dam in Iraq is in serious danger of an imminent collapse that could unleash a trillion-gallon wave of water, possibly killing thousands of people and flooding two of the largest cities in the country, according to new assessments by the U.S. Army Corps of Engineers and other U.S. officials.


They should know being experts in demolition in New Orleans.
Back to top
View user's profile Send private message
karlos
Validated Poster
Validated Poster


Joined: 26 Feb 2007
Posts: 2516
Location: london

PostPosted: Thu Nov 01, 2007 9:51 am    Post subject: Reply with quote

Iraq has rejected a report by a US panel that Iraq's largest dam is on the verge of a collapse, which could lead to massive flooding.

The latest quarterly report from Stuart W. Bowen Jr., the special inspector general for Iraq reconstruction, which includes a letter from the top two US military and civilian officials in Iraq, had warned that the Mosul Dam may soon collapse and cause flooding along the Tigris River "all the way to Baghdad.''

The letter by the US Ambassador Ryan Crocker and the top military commander in Iraq, Gen. David Petraeus, warned the flooding would hit particularly hard in Mosul, a city of 1.7 million people, the AP reported.

The letter referred to a 2006 US Army Corps of Engineers review that found the probability of the dam's failing to be "exceptionally high."

The review concluded that the Mosul Dam is "the most dangerous dam in the world'' because of erosion problems.

The Iraqi government spokesman Ali al-Dabbagh has said that "the Mosul Dam is in good condition and it is not in danger.'' He added that "the dam is under constant observation by the Iraqi government."

_________________
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    9/11, 7/7, Covid-1984 & the War on Freedom Forum Index -> Stratehy Of Tension, Fake Terror, 9/11 & 7/7 Truth News All times are GMT
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You can attach files in this forum
You can download files in this forum


Powered by phpBB © 2001, 2005 phpBB Group